ABOUT | FACTS & FIGURES


Pipeline

  • Mainline: 733 miles long; 36-inch diameter, 1,480 psi maximum operating pressure

  • Fairbanks Lateral: 30 miles long; 12-inch diameter


Gas Conditioning Facility

  • A 70-acre site at Prudhoe Bay will be constructed to remove carbon dioxide, hydrogen sulfide, and other impurities from the gas.